Cost · Wildfire loss · BC & Alberta
The cost to rebuild is not the amount that was insured.
Independent construction cost assessment for property owners, contractors and local governments after wildfire loss. British Columbia and Alberta.
Serving property owners and local governments affected by the 2026 Southern Interior wildfires, and across British Columbia and Alberta.
Establish what it costs to build, and defend the number.
In construction since 2003 across four seats — subtrade, general contractor, cost consultant and owner's representative. The work is the same in every one of them: establish what something actually costs to build, and be able to defend the number.
For brokers. If a client's settlement looks light and you can't tell them why, you can send them here. No referral fee in either direction.
A 1998 house can't be rebuilt to the 1998 code.
It has to meet the code in force today, and the gap runs wider than most owners are told.
Building envelope
Insulation levels and continuity of the thermal break
Glazing
Window and door performance requirements
Airtightness
Sealing and testing that didn't previously apply
Heating and cooling
Equipment selection and distribution
Ventilation
Mechanical ventilation requirements
Structure and seismic
Connections, bracing and holddowns
Egress
Stairs, guards and opening sizes
Wildfire interface
Cladding, roofing, soffits and vents — only where a local wildfire development permit area applies
Energy is one line in that list, not the whole story. Site work sits outside it again — on acreage, the well, septic, driveway, retaining and outbuildings are often the larger share of the rebuild.
Class C divisional. Not dollars per square foot.
A Class C divisional estimate: the class used to approve a budget before design is complete. Quantities measured from what exists (plans, photographs, assessment records), priced by trade division at dated local rates, accurate to about ±10–15%. The number moves with the measured scope, the code in force at your address, and the rates on the date of the estimate.
Not dollars per square foot. Square-foot pricing is a Class D method, it carries far wider variance, and it doesn't hold up when someone reviews it line by line. Every rate in my estimates carries its source and its date.
These aren't disclaimers. They're why the number is worth something.
I don't negotiate with your insurer.
I'm not a licensed adjuster and I don't act as one. I produce the cost evidence. You, your adjuster or your lawyer use it.
I don't advise on coverage.
I read a policy to know what to estimate. What it covers is a question for your broker or a lawyer.
I don't work on a percentage.
Fixed fee or hourly, quoted in writing before I start. My fee never depends on the size of your settlement, so the estimate means the same to everyone reading it.
I don't estimate and build the same property.
One role per property, always.
I don't promise a result.
A settlement review quantifies a difference between two estimates. What happens after that isn't mine to guarantee.
Four steps. Most of it from documents.
Most of this work is delivered remotely, which means distance from the loss isn't a constraint on getting started.
Tell me what happened.
And what you've been given so far. If it isn't work I should be doing, I'll say so.
Pieter Schoeman, Principal · Kingsley Advisory Group Ltd. · Langley, BC
Independent construction & development advisory · British Columbia and Alberta